OBCO
TR
9 November 2026 · 4 min read

Inspection Types: PPI, DUPRO, FRI and Loading Supervision

Product inspection is not a single check. Pre-production (PPI), during-production (DUPRO), final (FRI) inspection and loading supervision each reduce a different risk at a different stage.

Four inspections, four stages

InspectionWhenWhat is checkedRisk it reduces
PPI (pre-production)Before cuttingFabric, trims, approved sample, production planStarting production with the wrong material or sample
DUPRO (during production)When part of the order is done, usually 20 to 50 percentSamples from the line and the first finished units, measurements, workmanshipA defect spreading through the whole lot
FRI (final)When production is finished and mostly packedAQL sample, visual check, measurements, labels, packagingShipping defective goods
Loading supervisionOn loading dayCarton count and marks, container condition, loading, sealShort, wrong or damaged loading

Pre-production inspection (PPI)

A PPI confirms, before production starts, that materials and preparation match the order. Fabric colour, weight and quality, trims and the approved sample are compared, and the production plan and capacity are reviewed. It is most useful with a new supplier or a product made for the first time.

During-production inspection (DUPRO)

A DUPRO takes place while production is running. Samples are taken from the line and the first finished units; if measurement or workmanship problems show up early, the rest of the run can be corrected. Catching a defect weeks before the final inspection costs far less than reworking the whole lot.

Final inspection (FRI)

The FRI is the last check before shipment. The sample is drawn from the AQL table, defects are classed as critical, major or minor, and the lot passes or fails. Our pre-shipment inspection guide covers it in detail.

Loading supervision

In loading supervision the inspector stays on site for the whole loading. The container is checked inside and out, cartons are counted and their marks compared with the order, and the loading is photographed stage by stage. When the doors close, the seal number goes into the report.

Which one to choose

  • A new supplier or a new product: PPI, DUPRO and FRI together.
  • A regular supplier with a good record: FRI alone is often enough.
  • High-value, mixed, or multi-order containers: loading supervision on top of the FRI.
  • A product group that has had problems before: add a DUPRO or PPI at the stage where the problem arose.
WhatsApp support